TYPE OF PROJECT:  Secondary

DURATION: 5 months

At CATABB, the CLORED project has been carried out in which tests have been carried out with water from the Zadorra and the different pre-oxidants used in VA, both with and without AC filtration stage. With the results obtained, certain trends have been observed depending on the environmental conditions. Given that the object of the project is a priority for the CABB, the latter is interested in carrying out a second part of the project.

The aim is to deepen the analysis of the evolution of residual chlorine along the supply network by means of tests complementing the CLORED project.

  • Reinforcement of the results obtained by repeating the tests already carried out in the CLORED project
  • Analyze the evolution of the parameters with water coming from different points of the network in order to compare the experiment with the real situation